O fio das notícias do Brasil

Receba as notícias no WhatsApp

PAC’s stalled works drop from 62.7% to 6.8% after review of criteria

The decline followed a challenge by the Civil House to how Brazil’s Federal Audit Court (TCU) classified stalled projects; canceled and reclassified projects were removed from the list.

Por O Fio

This is a translation of the original article in Portuguese. Read the original (Português).

The share of stalled works under the PAC, the Growth Acceleration Program (Programa de Aceleração do Crescimento), plunged from 62.7% to 6.8% after a review of the criteria used to classify them. The change came after the Civil House, part of the government of President Lula, questioned the method used by Brazil’s Federal Audit Court (Tribunal de Contas da União, TCU), according to the newspaper Folha de S.Paulo.

The 62.7% figure refers to April 2025. With the review, canceled or reclassified projects stopped appearing on the list of stalled works, which reduced the percentage. In other words, much of the drop stems from a change in how the works are counted, not necessarily from construction sites resuming activity.

According to the court, there are currently 6,000 active works and 410 stalled ones. Also in December 2025, the rule that considered a work stalled after more than 90 days without a measurement bulletin, a document that records the progress of the work and supports payments, was removed.

What this means in practice: the same set of works can produce very different numbers depending on the yardstick used. A stricter criterion, such as the 90-days-without-measurement rule, tends to flag more works as stalled. Meanwhile, excluding canceled or reclassified projects shrinks the total considered and the percentage of problems.

For citizens, the debate goes beyond statistics. The PAC includes works on highways, sanitation and housing, which affect the daily lives of cities in every region. Knowing how many are truly stalled, and where, helps measure whether public money is reaching its destination.

The figures from April 2025 and the current ones, therefore, are not directly comparable without examining the methodology behind each. For those following a specific project in their municipality, the national figure says little: what matters is the situation of each project.

Folha de S.Paulo highlighted the story on its front page and in an internal report in the print edition.

Reporting from Folha de S.Paulo (Obras paradas do PAC caem após novo critério, p. 1, nacional), Folha de S.Paulo (Número de obras paralisadas do PAC cai após revisão de critérios do TCU, p. 17, nacional).

Esta matéria reúne informações publicadas pelos veículos citados acima, com edição da redação do O Fio. Conheça nossa política editorial. Encontrou um erro? Fale com a redação.

Deixe um comentário

O seu endereço de e-mail não será publicado. Campos obrigatórios são marcados com *

Os comentários passam por moderação antes de aparecer. Seu e-mail não é publicado. Ofensas, ataques pessoais e propaganda são removidos. Veja a política de privacidade.